1980 series 1 20vt build
Posted
Old Timer
All I need to say…
Posted
Settled In
MK1CRAZY YAHOOOOO!!!!!
Posted
Old Timer
Matt
Posted
Settled In
cheers mateBrad. said
All I need to say…
thanks beeno, i cant wait myselfBeeno said
Wow looking great man. Well done. Cant wait to see this finished.
cheers, yeah its good to be able to bolt bits onpazwaa said
Colour looks amazing, and must be so good to start rebuilding everything back up. Great job Matt
well got it back down on its wheels last week,
mk2 16v tensioner fitted and cambelt done
so decided to do a test fit of the engine ,
then started to think about fabricating the wilwood pedal box, so cut off the pedals off the mk1 steering column
thats as far as i got coz need to grab some steel and get a welder
Posted
Old Timer
Matt
Posted
Settling In
Posted
Old Timer
I bought a stainless accumulator bracket from CQ and used an original plastic swirl pot. Had to change the shape of the bracket as the swirl pot is square but yours will lend itself to the bracket as it's round.
You just need to make a bracket up to pull the fuel lines away from the rear axle.
Posted
Settled In
MK1CRAZY YAHOOOOO!!!!!
Posted
Settled In
0 guests and 0 members have just viewed this: None.