Finishing off series 1 tintop project + MOT - South London
Posted
#1174830
(In Topic #140441)
Old Timer
Finishing off series 1 tintop project + MOT - South London
major outstanding items needed:
1. Reconnect bonnet release cable (may need to move radiator to access bottom latch)
2. Check and modify front wiring loom for lights (supplied)
3. Install and connect horn (supplied)
4. Install front callipers (supplied already rebuilt and ready to use)
5. Bleed brakes
6. Install dash (supplied)
7. Commission and tune carbs
8. Weld small square section of rot on floorpan (left and right side) - sills are fine.
9. Adapt rear washer bottle to feed front washer jets
10. Install speedo cable (supplied)
11. Reweld one exhaust hanger to suit the body
12. MOT
The engine and rear wiring looms are 100% complete. The dashboard wiring is complete with the exception of 3 loose wires that I do not know where they go. i need it done asap but professionally and to a high standard and i just do not have the time to do it. call me on 07717274769 or pm on this forum.
cheers
1980 Series 1 GTI (gone now .. what a mistake selling her!)
1979 Series 1 LD - the Mandarin Dragon … gone as well. oh dear.
1979 Series 1 LD - the Mandarin Dragon … gone as well. oh dear.
Posted
Settled In
Ask for Paul, mention my name "Aaron" and he will prob do it as a private.
Good luck.
Posted
Old Timer
1980 Series 1 GTI (gone now .. what a mistake selling her!)
1979 Series 1 LD - the Mandarin Dragon … gone as well. oh dear.
1979 Series 1 LD - the Mandarin Dragon … gone as well. oh dear.
0 guests and 0 members have just viewed this: None.