Skip navigation

Comical Engineering terms

Post

Back to the top
Engineering Terms
* A NUMBER OF DIFFERENT APPROACHES ARE BEING TRIED
We are still daffodil in the wind.


* EXTENSIVE REPORT IS BEING PREPARED ON A FRESH APPROACH TO THE PROBLEM
We just hired three kids fresh out of college.


* CLOSE PROJECT COORDINATION
We know who to blame.


* MAJOR TECHNOLOGICAL BREAKTHROUGH
It works OK, but looks very hitech.


* CUSTOMER SATISFACTION IS DELIVERED ASSURED
We are so far behind schedule the customer is happy to get it delivered.


* PRELIMINARY OPERATIONAL TESTS WERE INCONCLUSIVE
The darn thing blew up when we threw the switch


* TEST RESULTS WERE EXTREMELY GRATIFYING
We are so surprised that the stupid thing works.


* THE ENTIRE CONCEPT WILL HAVE TO BE ABANDONED
The only person who understood the thing quit.


* ALL NEW
Parts not interchangeable with the previous design.


* RUGGED
Too damn heavy to lift!


* LIGHTWEIGHT
Lighter than RUGGED.


* YEARS OF DEVELOPMENT
One finally worked.

Post

Back to the top
I once visited a Company whose Mean Time Between Failures of a Product was 1000 hours. As I was seeing failures between 1 and 2 hours on the product.

How they determined this was to take 500 of the units and turn them on.  They had a failure of them after 2 hours. 500X2 1000 hours

True Story.

What do Divorces, Great Coffee, and Car Electrics all have in common?

They all start with GOOD Grounds.

Where are my DIY Links?

Post

Back to the top

Comical Engineering terms

Made me chuckle :)

1986 Cabriolet (long resto!)
1983 Cabriolet (daily pain in the bum)
1983 T25 (weekend pain in the bum)

Follow us on:

Facebook: https://www.facebook.com/vwgolfmk1oc/
Twitter: https://www.facebook.com/vwgolfmk1oc/
Instagram: https://www.facebook.com/vwgolfmk1oc/

Banner
0 guests and 0 members have just viewed this: None.